# | Project Name | Investor | City | End date | Project Description |
1 | Reconstruction of the Neurological Hospital | Ministry of Health | Tiranë | 2000 | Reconstruction |
2 | Construction of Mat Court | Mat | 2001 | New construction | |
3 | Training center for health emergency services | US Embassy | Tiranë | 30.04.2003 | Excavation and filling works, hydraulic works, electrical works, heating works, ventilation, construction of windows and facades, construction of gardens, layer works and square systems. |
4 | Reconstruction of conference halls Q.K.F.A. | Q.K.F.A. | Tiranë | 28.06.2004 | Reconstruction of the building from inside and outside such as demolition works, plastering works, plumbing works, electrical works, tiling, installation of doors and windows, etc. |
5 | Rehabilitation of the offices of the Burrel water company | GDWSS PIU | Burrel | 03.12.2004 | Reconstruction of the building from inside and outside such as: demolition works, plastering works, plumbing works, electrical works, tiling, installation of doors and windows, exterior systems, etc. |
6 | Reconstruction of the 0.4KW electric network in “Mujo Ulqinaku” street and “Vila” street | KESH Durrës | Durrës | 07.12.2004 | Excavation and filling works, installation of electrical pipes and cables, construction of concrete wells, installation of steel pipes, etc. |
7 | Periodic maintenance in Fier region CWW/NCB/2004/3 | Ministry of Internal Affairs | Fier | 08.12.2006 | Periodic maintenance (excavation, ballast, systematization) |
8 | Reconstruction of the RENEA department building | RENEA Department | Tiranë | 2007 | Excavation and filling works, hydraulic works, electrical works, heating works, ventilation, construction of windows and facades, construction of gardens, layer works and square systems. |
9 | Periodic maintenance in Fier region CWW/NCB/2004/3 | Ministry of Internal Affairs | Lushnjë | 08.12.2007 | Periodic maintenance (excavation, ballast, systematization) |
10 | Reconstruction Building no.29 Student city | Student treatment number 1 | Tiranë | 11.10.2008 | Reconstruction of the building from inside and outside such as demolition works, plastering works, plumbing works, electrical works, tiling, installation of doors and windows, etc. |
11 | 2-floor residential building | Ferdinand Shehu | Tiranë | 30.03.2010 | Excavation and filling works, concrete / weapons works, hydraulic works, electrical works, construction of windows and facades, construction of gardens, layer works and square systems. |
12 | Works in F.SH.F. | F.SH.F | Tiranë | 1.04.2010 | Construction works (demolition, brick wall, plastering, plastering, skating, window doors, painting, painting, etc.), sanitary works, electrical works, engineering network works and various equipment |
13 | Apartment 2,5,6,7,8 floors and an underground parking floor in Yzberisht, Kashar commune | Everest ShPK | Tiranë | 30.05.2010 | Excavation and filling works, concrete / weapons works, hydraulic works, works for KUB and KUZ, electrical works, construction of windows and facades, construction of gardens, works of layers and square systems. |
14 | Palace of Culture, Kamza | Municipality of Kamëz | Kamëz | 31.05.2011 | Excavation and filling works, concrete / weapons works, hydraulic works, works for KUB and KUZ, electrical works, construction of windows and facades, construction of gardens, works of layers and square systems. |
15 | Power line MV Manza G3226 | Plus Communication | Durrës | 25.08.2011 | Electric line construction for antennas. |
16 | Power line MV Plan i Bardhë G2804 | Plus Communication | Bulqizë | 20.10.2011 | Electric line construction for antennas. |
17 | Power line LV Homesh G2806 | Plus Communication | Dibër | 26.10.2011 | Electric line construction for antennas. |
18 | Hohesh and Plan i Bardhë metal fence | Plus Communication | Dibër, Bulqizë | 28.10.2011 | Metal construction for perimeter fence. |
19 | Medium voltage line, Mide | Plus Communication | Pukë | 04.11.2011 | Metal constructions, and electrical equipment for replacing the medium voltage line. |
20 | Reconstruction, rehabilitation of spaces, facades of buildings at the entrance of Durrës | Municipality of Durrës | Durrës | 06.01.2012 | |
21 | Repairs: medium voltage lines | Plus Communication | 22.05.2012 | Repairs of medium voltage lines. | |
22 | Creating a sports entertainment space for young people and children in block no. 6 of the municipal unit no.4 | National Centre for Social Studies | Tiranë | 08.07.2012 | Excavation and filling works, concrete works, arrangements, planting with grass, bushes and trees, construction of basketball court, placement of benches, trash cans, etc. |
23 | Construction of the stairs of the stadium “Kamza” | Municipality of Kamëz | Kamëz | 03.01.2014 | |
24 | Reconstruction of Laprakë Food Market | Municipality of Tirana | Tiranë | 2014 | Reconstruction |
25 | Reconstruction of the Directorate of Agriculture | Directorate of Agriculture Tiranë | Tiranë | 2015 | Reconstruction |
26 | Construction of new 20KV feeders from sub-station 110/20KV Kashar for the area of Bathore, F29 and F30 as well as the new TU network with self-contained cable ABC of F29 feeder | OSHEE | Tiranë | 14.04.2016 | |
27 | Info Point establishment | National Tourism Agency | Tiranë | 2016 | New construction |
28 | Administrative Building for physical and tahograph control DPSHTRR | DPSHTRR | Tiranë | 2016 | New construction |
29 | Construction of the new building for national service of health emergency | QKUM | Tiranë | 2016 | New construction |
30 | The project before the entrance of the Port Phase I, II and III | Municipality of Durrës | Durrës | 2016 | New construction |
31 | Reconstruction of the water supply facility in the village of Ndroq and Lagjia e Re | UKT | Tiranë | 2016 | Reconstruction |
32 | Rehabilitation of the 110KV implant of sub-station Laç 1 | OST | Kurbin | 2016 | Reconstruction |
33 | Water supply reconstruction, Ndroq village | UKT Tiranë | Tiranë | 14.12.2016 | |
34 | Rehabilitation of the 110KV implant of sub-station Laç 1 | OST | Kurbin | 2017 | New construction |
35 | Facade reconstruction of public buildings in Dibra Street | Municipality of Tirana | Tiranë | 2017 | Reconstruction |
36 | Reconstruction and fencing of warehouses in regional water supply Phase I | UKT | Tiranë | 2018 | Reconstruction |